NAME
       Date::Manip::Calc - describes date calculations

SYNOPSIS
       Two objects (both of which are either Date::Manip::Date or
       Date::Manip::Delta objects) may be used to creates a third object based
       on those two.

          $delta  = $date->calc($date2 [,$subtract] [,$mode]);

          $date2  = $date->calc($delta [,$subtract]);
          $date2  = $delta->calc($date1 [,$subtract]);

          $delta3 = $delta1->calc($delta2 [,$subtract] [,$no_normalize]);

DESCRIPTION
       This document describes the different types of calculations that can be
       done using dates and deltas.  Date calculations are much more
       complicated than they initially appear, so this document is fairly
       large.

       The complication in date calculations is due to the fact that it is
       impossible to express some parts of a delta as an exact length.  Some
       examples will illustrate this:

       As an example, let's take two dates and determine how much time elapsed
       between them:

          Nov 3 2016 11:00:00
          Dec 5 2016 12:00:00

          Elapsed time: 770 hours

       There are several ways to describe the time that elapsed.  The first
       way is to give the difference exactly.  This is the exact delta.

       An exact delta is always described in terms of hours, minutes, and
       seconds.

       The problem with this is that we don't think in terms of exact deltas.
       We think in terms which cannot be expressed exactly.

       For example, most people would look at those two dates and think:

          Perceived: 1 month, 2 days, 1 hour

       But the two dates:

          Feb 3 2016 11:00:00
          Mar 5 2016 12:00:00

          Elapsed time: 745 hours
          Perceived: 1 month, 2 days, 1 hour

       Some fields in a delta do not have an exact length.  A year is usually
       365 days long, but sometimes it is 366.  A month might be 28, 29, 30,
       or 31 days long.

       Perhaps the most unexpected difficulty is that days are not of constant
       length.  Most people would define a day as 24 hours, but when you take
       daylight saving time into account that definition produces unexpected
       results.  The following calculation illustrates this:

          Nov 5, 2011 02:30 EDT
          + 24 hour

          Result: Nov 6, 2011 01:30 EST

       This immediately causes most people to redefine a day as the amount of
       time between the same wall clock time.  For example, the amount of time
       between noon one day and noon the next (regardless of daylight saving
       time changes).

       This definition doesn't work either.  For example:

          Mar 12, 2011 02:30 EST
          + 1 day (same time next day)

          Result: Mar 13 02:30 EST

       But that date does not exist!  Neither does:

          Result: Mar 13 02:30 EDT

       An alternate calculation could be:

          Nov 5, 2011 01:30 EDT
          + 1 day (same time next day)

          Result: Nov 6, 01:30 EDT
          Result: Nov 6, 01:30 EST

       Both of those results exist.  Which result did you mean?  The first one
       is probably correct (since it is 24 hours later), but an hour later,
       you will have the same clock time again.

       So, the same time next day definition doesn't work at all for some
       dates (during a 'spring forward' type daylight saving time transition)
       and is ambiguous for others (during a 'fall back' type daylight saving
       time transition).

       Calculations involving exact deltas are unambiguous in all cases.

       A second class of delta is called a semi-exact delta, and these add
       days (and weeks) to the delta, and treats days as a "same time next
       day" at all times except the two cases where the resulting date falls
       in the period where a daylight saving time transition is occurring.
       Then it falls back to the 24 hour definition.

       A final class of delta is an approximate delta which includes all of
       the fields (years and months).  This allows Date::Manip to handle
       deltas in a way that is consistent with how most people perceive the
       elapsed time.  It should be noted that there is some uncertaintly there
       as not everyone's definition of how a delta is perceived is the same,
       but in general, they should be closer to what most people think of.

TYPES OF CALCULATIONS
       This document describes the different types of calculations.
       Calculations involve two types of Date::Manip objects: dates and
       deltas. These are described in the Date::Manip::Date and
       Date::Manip::Delta manuals respectively.

       Two objects (two dates, two deltas, or one of each) are used.  In all
       cases, if a second object is not passed in, undef is returned.

       There are 3 types of calculations:

       Date/Date calculations
           A  calculation involving 2 dates is used to determine the amount of
           time (the delta) between them.

              $delta  = $date1->calc($date2 [,$subtract] [,$mode]);

           Two dates can be worked with and a delta will be produced which  is
           the amount of time between the two dates.

           $date1  and  $date2 are Date::Manip::Date objects with valid dates.
           The Date::Manip::Delta  object  returned  is  the  amount  of  time
           between  them.  If  $subtract is not passed in (or is 0), the delta
           produced is:

              DELTA = DATE2 - DATE1

           If $subtract is non-zero, the delta produced is:

              DELTA = DATE1 - DATE2

           The  $subtract  argument  has   special   importance   when   doing
           approximate calculations, and this is described below.

           If  either  date  is invalid, a delta object will be returned which
           has an error associated with it.

           The $mode argument describes the type of delta that is produced and
           is described below in "MODE".

       Date/Delta calculations
           Date/delta  calculations  can   be   performed   using   either   a
           Date::Manip::Date  or  Date::Manip::Delta  object  as  the  primary
           object:

              $date2  = $date1->calc($delta [,$subtract]);
              $date2  = $delta->calc($date1 [,$subtract]);

           A date and delta can be combined to yield a date that is the  given
           amount of time before or after it.

           $date1  and  $delta  are  Date::Manip::Date  and Date::Manip::Delta
           objects respectively. A new Date::Manip::Date object  is  produced.
           If  either  $date1  or $delta are invalid, the new date object will
           have an error associated with it.

           Both of the calls above  perform  the  same  function  and  produce
           exactly the same results.

           If  $subtract  is  not  passed  in,  or is 0, the resulting date is
           formed as:

              DATE2 = DATE1 + DELTA

           If $subtract is non-zero, the resulting date is:

              DATE2 = DATE1 - DELTA

           The  $subtract  argument  has   special   importance   when   doing
           approximate   calculations,   and   this   is  described  below  in
           "SUBTRACTION".

       Delta/Delta calculations
           Delta/delta calculations can be performed to  add  two  amounts  of
           time together, or subtract them.

              $delta3 = $delta1->calc($delta2 [,$subtract] [,$no_normalize]);

           If  $subtract is not passed in, or is 0, the resulting delta formed
           is:

              DELTA3 = DELTA1 + DELTA2

           If $subtract is non-zero, then the resulting delta is:

              DELTA3 = DELTA1 - DELTA2

           $delta1 and $delta2 are valid Date::Manip::Delta objects, and a new
           Date::Manip::Delta object is produced.

           $no_normalize can be the string 'nonormalize' or a  non-zero  value
           (in which case $subtract MUST be entered, even if it is 0).

MODE
       Date::Manip  calculations can be divided into two different categories:
       business and non-business; and within those are  three  sub-categories:
       exact, semi-exact, and approximate.

       Business and non-business calculations
           A  business  calculation  is  one  where  the  length of the day is
           determined by the length of the work day, and  only  business  days
           (i.e.  days  in  which  business  is conducted) count. Holidays and
           weekends are omitted (though there is some flexibility in  defining
           what  exactly  constitutes  the  work  week  as  described  in  the
           Date::Manip::Config manual). This is described in more detail below
           in "BUSINESS MODE CONSIDERATIONS".

           A non-business mode calculation is the normal type  of  calculation
           where no days are ignored, and all days are full length.

       Exact, semi-exact, and approximate calculations
           An  exact  calculation is one in which the delta used (or produced)
           is an exact delta.  An exact delta is described in more  detail  in
           the Date::Manip::Delta manual, but the short explanation is that it
           is  a  delta  which only involves fields of an exactly known length
           (hours, minutes, and seconds).  Business deltas also  include  days
           in the exact part.  The value of all other fields in the delta will
           be zero.

           A  semi-exact  calculation  is  one  in  which  the deltas used (or
           produced) is a semi-exact delta.  This is  also  described  in  the
           Date::Manip::Delta  manual,  but  the  short explanation is that it
           includes days and weeks (for standard calculations) or  weeks  (for
           business  calculations)  in  addition to the exact fields.  A semi-
           exact day is defined as the same clock time on two successive days.
           So noon to noon is 1 day (even though it  may  not  be  exactly  24
           hours due to a daylight saving time transition).  A week is defined
           as 7 days. This is described in more detail below.

           An  approximate  calculation  is  one  in which the deltas used (or
           produced) are approximate, and may include any of the fields.

       In date-delta and delta-delta calculations, the mode of the calculation
       will be determined automatically by the delta. In the case of date-date
       calculations, the mode is supplied as an argument.

       Mode in date-date calculations
           When doing a date-date calculation, the following call is used:

              $delta = $date1->calc($date2 [,$subtract] [,$mode]);

           $mode defaults to "exact". The delta produced will be be  either  a
           business  or non-business delta; exact, semi-exact, or approximate,
           as specified by $mode.

           Currently, the possible values that $mode can have are:

              exact    : an exact, non-business calculation
              semi     : a semi-exact, non-business calculation
              approx   : an approximate, non-business calculation

              business : an exact, business calculation
              bsemi    : a semi-exact, business calculation
              bapprox  : an approximate, business calculation

       Mode in date-delta calculations
           When doing calculations of a date and a delta:

              $date2 = $date1->calc($delta [,$subtract]);
              $date2 = $delta->calc($date1 [,$subtract]);

           the mode is not passed in. It  is  determined  exclusively  by  the
           delta.  If  $delta  is  a business delta, A business calculation is
           done. If $delta is a non-business delta, a non-business calculation
           will be done.

           The $delta  will  also  be  classified  as  exact,  semi-exact,  or
           approximate based on which fields are non-zero.

       Mode in delta-delta calculations
           When doing calculations with two deltas:

              $delta3 = $delta1->calc($delta2 [,$subtract]);

           the mode is not passed in. It is determined by the two deltas.

           If  both deltas are business mode, or both are non-business mode, a
           new delta will be produced of the same type.

           It one of the deltas is a business mode and the other is  not,  the
           resulting  delta  will  have  an  error condition since there is no
           direct correlation between the two types of deltas. Even though  it
           would  be  easy  to add the two together, it would be impossible to
           come up with a result that is meaningful.

           If both deltas are exact, semi-exact, or approximate, the resulting
           delta is the same. If one delta is approximate and one is not, then
           the resulting delta is approximate.  It is NOT treated as an error.
           Likewise, if one is semi-exact and the other  exact,  a  semi-exact
           delta is produced.

TIMEZONE CONSIDERATIONS
       date-date calculations
           When  doing  a business calculation, both dates must be in the same
           time zone or an error is produced.

           For non-business  calculations,  when  calculating  the  difference
           between two dates in different time zones, $date2 will be converted
           to  the  same  timezone  as $date1 and the returned date will be in
           this timezone.

       date-delta calculations
           When adding a delta to a date, the resulting date will  be  in  the
           same time zone as the original date.

       delta-delta calculations
           No timezone information applies.

       It  should  also  be noted that daylight saving time considerations are
       currently ignored when doing business calculations.  In  common  usage,
       daylight saving time changes occurs outside of the business day, so the
       business  day length is constant.  As a result, daylight saving time is
       ignored.

BUSINESS MODE CONSIDERATIONS
       In order to correctly do business  mode  calculations,  a  config  file
       should  exist  which contains the section defining holidays (otherwise,
       weekends will be ignored,  but  all  other  days  will  be  counted  as
       business    days).    This    is   documented   below,   and   in   the
       Date::Manip::Config  section  of  the   documentation.    Some   config
       variables (namely WorkWeekBeg, WorkWeekEnd, WorkDayBeg, WorkDayEnd, and
       WorkDay24Hr) defined the length of the work week and work day.

       If  the workday is defined as 08:00 to 18:00, a work week consisting of
       Mon-Sat, and the standard (American) holidays,  then  from  Tuesday  at
       12:00  to  the following Monday at 14:00 is 5 days and 2 hours.  If the
       "end" of the day is reached in a calculation, it automatically switches
       to the next day.  So, Tuesday at 12:00 plus 6  hours  is  Wednesday  at
       08:00 (provided Wed is not a holiday).  Also, a date that is not during
       a  workday  automatically  becomes  the start of the next workday.  So,
       Sunday 12:00 and Monday at 03:00 both automatically becomes  Monday  at
       08:00 (provided Monday is not a holiday).

       Note  that  a  business week is treated the same as an exact week (i.e.
       from Tuesday to Tuesday, regardless of holidays).  Because  this  means
       that the relationship between days and weeks is NOT unambiguous, when a
       semi-exact  delta  is  produced  from two dates, it will be in terms of
       d/h/mn/s (i.e. no week field).

       Anyone using business mode is going to notice a  few  quirks  about  it
       which  should  be  explained.   When I designed business mode, I had in
       mind what a business which promises 1 business  day  turnaround  really
       means.

       If  you do a business calculation (with the workday set to 9:00-17:00),
       you will get the following:

          Saturday at noon + 1 business day = Tuesday at 9:00
          Saturday at noon - 1 business day = Friday at 9:00

       What does this mean?

       As an example, say I use a business that works 9-5 and they have a drop
       box so I can drop things off  over  the  weekend  and  they  promise  1
       business  day  turnaround.   If  I  drop  something  off  Friday night,
       Saturday, or Sunday, it doesn't matter.  They're going to  get  started
       on  it  Monday  morning.  It'll be 1 business day to finish the job, so
       the earliest I can expect it to be done is around 17:00 Monday or  9:00
       Tuesday morning.  Unfortunately, there is some ambiguity as to what day
       17:00  really  falls  on, similar to the ambiguity that occurs when you
       ask what day midnight falls on.  Although it's  not  the  only  answer,
       Date::Manip  treats  midnight as the beginning of a day rather than the
       end of one.  In the same way, 17:00 is equivalent to 9:00 the next  day
       and  any  time  the date calculations encounter 17:00, it automatically
       switch to 9:00 the next day.  Although this introduces some  quirks,  I
       think  this  is justified.  I also think that it is the way most people
       think of it. If I drop something off  first  thing  Monday  morning,  I
       would  expect  to pick it up first thing Tuesday if there is 1 business
       day turnaround.

       Equivalently, if I want a job to be finished on Saturday  (despite  the
       fact  that I cannot pick it up since the business is closed), I have to
       drop it off no later than Friday at  9:00.   That  gives  them  a  full
       business  day to finish it off.  Of course, I could just as easily drop
       it off at 17:00 Thursday, or any time between  then  and  9:00  Friday.
       Again, it's a matter of treating 17:00 as ambiguous.

       So  Saturday  +  1 business day = Tuesday at 9:00 (which means anything
       from Monday 17:00 to Tuesday 9:00), but Monday at 9:01 + 1 business day
       = Tuesday at 9:01 which is unambiguous.

       It should be noted that when  adding  years,  months,  and  weeks,  the
       business  day  is ignored.  Once they've been added, the resulting date
       is forced to be a business time (i.e. it moves to the start of the next
       business day if it wasn't one already) before proceeding with the days,
       hours, minutes, and seconds part.

EXACT, SEMI-EXACT, AND APPROXIMATE DATE/DELTA CALCULATIONS
       This section contains more details about exactly how exact, semi-exact,
       and approximate calculations are performed for date/delta calculations.

       All calculations make use of some exact quantities, including:

         1 year   = 12 months
         1 week   = 7 days
         1 hour   = 60 minutes
         1 minute = 60 seconds

       This leaves two relationships which are not exact:

         1 month  = ? days
         1 day    = ? hours

       For non-business calculations, a day is usually 24 hours long.  Due  to
       daylight  saving  time  transitions  which might make a day be 23 or 25
       hours long (or in some cases, some other length), the relation  is  not
       exact.   Whenever possible, a day is actually measured as the same time
       on two days (i.e. Tuesday at noon to Wednesday at noon)  even  if  that
       period  is  not  precisely 24 hours.  For business calculations, a days
       length is determined by the  length  of  the  work  day  and  is  known
       exactly.

       Exact calculations involve ONLY quantities of time with a known length,
       so there is no ambiguity in them.

       Approximate and semi-exact calculations involve variable length fields,
       and so they must be treated specially.

       In  order  to do an approximate or semi-exact calculation, the delta is
       added to a date in pieces, where the fields in each piece have an exact
       and known relationship.

       For a non-business calculation, a calculation occurs in  the  following
       steps:

         year/month fields added
         week/day fields added
         hour/minute/second fields added

       For a business calculation, the steps are:

         year/month fields added
         week field added
         day field added
         hour/minute/second fields added

       After  each  step, a valid date must be present, or it will be adjusted
       before proceeding to the next step.  Note  however  that  for  business
       calculations,  the  first  step  must  produce  a  valid  date, but not
       necessarily a business date.  The second  step  will  produce  a  valid
       business date.

       A series of examples will illustrate this.

       A date and non-business approximate delta
              date  = Mar 31 2001 at 12:00:00
              delta = 1 year, 1 month, 1 day, 1 hour

           First,  the year/month fields are added without modifying any other
           field.  This would produce:

              Apr 31, 2002 at 12:00

           which is not valid.  Any time the year/month fields produce  a  day
           past  the  end  of the month, the result is 'truncated' to the last
           day of the month, so this produces:

              Apr 30, 2002 at 12:00

           Next the week/day fields are added producing:

              May 1, 2002 at 12:00

           and finally, the exact fields  (hour/minute/second)  are  added  to
           produce:

              May 1, 2002 at 13:00

       A simple business calculation
           Assuming a normal Monday-Friday work week from 8:00 - 17:00:

              date  = Wed, Nov 23, 2011 at 12:00
              delta = 1 week, 1 day, 1 hour

           First, the week field is added:

              Wed, Nov 30, 2011 at 12:00

           Then the day field is added:

              Thu, Dec 1, 2011 at 12:00

           Then the exact fields are added:

              Thu, Dec 1, 2011 at 13:00

       A business example where a holiday impacts it
           In  America,  Jul 4 is a holiday, so Mon, Jul 4, 2011 is not a work
           day.

              date  = Mon, Jun 27, 2011 at 12:00
              delta = 1 week, 1 day, 1 hour

           First, the week field is added:

              Mon, Jul 4, 2011 at 12:00

           Since that is not a work day, it immediately becomes:

              Tue, Jul 5, 2011 at 8:00

           Then the day field is added:

              Wed, Jul 6, 2011 at 8:00

           and finally the remaining fields:

              Wed, Jul 6, 2011 at 9:00

       Calculation where daylight savings time impacts it (fall example)
           In the America/New_York timezone (Eastern  time),  on  November  6,
           2011, the following time change occurred:

              2011-11-06 02:00  EDT  => 2011-11-06 01:00  EST

           Three simple calculations illustrate how this is handled:

              date  = 2011-11-05 02:30 EDT
              delta = 1 day

           Adding the day produces:

              2011-11-06 02:30  EDT

           which is valid, so that is the result.

           Similarly:

              date  = 2011-11-07 02:30 EST
              delta = -1 day

           produces:

              2011-11-06 02:30 EST

           which is valid.

           Finally:

              date  = 2011-11-05 02:30 EDT
              delta = 2 days

           produces:

              2011-11-07 02:30  EST

           The  calculation  will  preserve the savings time where possible so
           the resulting day will have the same offset from UTC.  If  that  is
           not  possible,  but the resulting day is valid in the other offset,
           that will be used instead.

       Calculation where daylight savings time impacts it (spring example)
           In the America/New_York timezone (Eastern time), on March  13,  the
           following time change occurred:

              2011-03-13 02:00  EST  => 2011-03-13 03:00  EDT

           In this case, a calculation may produce an invalid date.

              date  = 2011-03-12 02:30 EST
              delta = 1 day

           produces:

              2011-03-13 02:30 EST

           This is not valid.  Neither is:

              2011-03-13 02:30 EDT

           In  this  case,  the  calculation will be redone converting days to
           24-hour periods, so the calculation becomes:

              date  = 2011-03-12 02:30 EST
              delta = 24 hours

           which will produce a valid date:

              2011-03-13 03:30 EDT

EXACT, SEMI-EXACT, AND APPROXIMATE DATE/DATE CALCULATIONS
       This section contains more details about exactly how exact, semi-exact,
       and approximate calculations are performed for date/date calculations.

       When calculating the delta  between  two  dates,  the  delta  may  take
       different  forms  depending on the mode passed in. An exact calculation
       will produce a delta which included only exact  fields.   A  semi-exact
       calculation   may  produce  a  semi-exact  delta,  and  an  approximate
       calculation may produce an approximate delta.  Note  that  if  the  two
       dates  are close enough together, an exact delta will be produced (even
       if the mode is semi-exact or approximate), or it may  produce  a  semi-
       exact delta in approximate mode.

       For  example, the two dates "Mar 12 1995 12:00" and "Apr 13 1995 12:00"
       would have an exact delta of "744 hours", and a semi-exact delta of "31
       days".  It would have an approximate delta of "1 month 1 day".

       Two dates, "Mar 31 12:00" and "Apr 30 12:00"  would  have  deltas  "720
       hours" (exact), "30 days" (semi-exact) or "1 month" (approximate).

       Approximate  mode is a more human way of looking at things (you'd say 1
       month and 2 days more often then 33 days), but it is less meaningful in
       terms of absolute time.

       One thing to remember is that an exact delta is exactly the  amount  of
       time  that  has  passed, including all effects of daylight saving time.
       Semi-exact  and  approximate  deltas  usually  ignore  the  affects  of
       daylight saving time.

SUBTRACTION
       In  exact and semi-exact calculations, and in delta-delta calculations,
       the the $subtract argument is easy to understand.  When working with an
       approximate delta however (either when adding an approximate delta to a
       date, or when taking two dates to get an approximate delta), there is a
       degree of uncertainty in how the calculation is done, and the $subtract
       argument is used to specify exactly how the approximate delta is to  be
       use. An example illustrates this quite well.

       If  you  take  the  date Jan 4, 2000 and subtract a delta of "1 month 1
       week" from it, you end up with Nov 27, 1999 (Jan 4, 2000 minus 1  month
       is  Dec 4, 1999; minus 1 week is Nov 27, 1999). But Nov 27, 1999 plus a
       delta of "1 month 1 week" is Jan 3, 2000 (Nov 27, 1999 plus 1 month  is
       Dec 27, 1999; plus 1 week is Jan 3, 2000).

       In  other  words the approximate delta (but NOT the exact or semi-exact
       delta) is different depending on whether you move from earlier date  to
       the  later  date,  or  vice  versa.  And  depending  on  what  you  are
       calculating, both are useful.

       In order to resolve this, the $subtract argument can take on the values
       0, 1, or 2, and have different meanings.

       $subtract in approximate date-date calculations
           In the call:

              $delta = $date1->calc($date2,$subtract,"approx");

           if $subtract is 0, the resulting delta can be added  to  $date1  to
           get $date2. Obviously $delta may still be negative (if $date2 comes
           before $date1).

           If  $subtract  is  1,  the  resulting  delta can be subtracted from
           $date1 to get $date2 (the  deltas  from  these  two  are  identical
           except for having an opposite sign).

           If  $subtract  is  2, the resulting delta can be added to $date2 to
           get $date1. In other words, the following are identical:

              $delta = $date1->calc($date2,2,"approx");
              $delta = $date2->calc($date1,"approx");

       $subtract in approximate date-delta calculations
           In the call:

              $date2 = $date1->calc($delta,$subtract);

           If $subtract is 0, the  resulting  date  is  determined  by  adding
           $delta to $date1.

           If  $subtract is 1, the resulting date is determined by subtracting
           $delta from $date1.

           If $subtract is 2, the resulting date is the date which $delta  can
           be added to to get $date1.

           For business mode calculations, $date1 will first be adjusted to be
           a  valid  work  day (if it isn't already), so this may lead to non-
           intuitive results.

           In some cases, it is impossible to do a calculation with  $subtract
           =  2.   As  an example, if the date is "Dec 31" and the delta is "1
           month", there is no date which you can add "1 month" to to get "Dec
           31".  When this occurs, the date returned has an error flag.

APPROXIMATE DATE/DATE CALCULATION
       There are two different ways to look at the approximate  delta  between
       two dates.

       In Date::Manip 5.xx, the approximate delta between the two dates:

          Jan 10 1996 noon
          Jan  7 1998 noon

       was  1:11:4:0:0:0:0  (or  1  year, 11 months, 4 weeks).  In calculating
       this, the first date was adjusted as far as it  could  go  towards  the
       second  date  without  going  past  it with each unit starting with the
       years and ending with the seconds.

       This gave a strictly positive or negative delta, but it isn't  actually
       how most people would think of the delta.

       As  of Date::Manip 6.0, the delta is 2:0:0:-3:0:0:0 (or 2 years minus 3
       days). Although this leads to mixed-sign deltas,  it  is  actually  how
       more  people  would  think  about  the  delta.  It  has  the additional
       advantage of being easier to calculate.

       For  non-business  mode  calculations,  the  year/month  part  of   the
       approximate  delta  will  move  a date from the year/month of the first
       date into the year/month of the second date. The remainder of the delta
       will adjust the days/hours/minutes/seconds as appropriate.

       For approximate business mode calculations, the year,  date,  and  week
       parts  will  be  done  approximately,  and  the  remainder will be done
       exactly.

KNOWN BUGS
       None known.

BUGS AND QUESTIONS
       Please refer to the Date::Manip::Problems documentation for information
       on submitting bug reports or questions to the author.

SEE ALSO
       Date::Manip        - main module documentation

LICENSE
       This script is free software; you can redistribute it and/or modify  it
       under the same terms as Perl itself.